DECK-O-DRAIN Accessories

Product Application

Typical Pool Deck Application

Product Application Directions

DECK-O-DRAIN installation is quick and easy.

STEP #:

  1. Grade sub-soil, sloping it toward drain location
  2. Along planned path for drain, drive 3½” wide, short stakes into the ground. Space them 30 inches apart. Two nailing clips per each 10 ft. section.
  3. Attach snap-on nailing clips and place drain over the stakes. Use couplers to ensure a straight, even line.
  4. After carefully aligning, nail firmly to stakes.
  5. Insert adapter. Can be hooked to 1½”or 2″ PVC pipe.  Pipe can be adapted to any direction.
  6. Place concrete and trowel gradual slope to DECK-O-DRAIN.
  7. After concrete has set, install end plug, remove protective tape and drain is ready to carry water away.

Download PDF Version

About W. R. Meadows

W. R. MEADOWS, INC. designs, manufactures, and markets high-quality building materials for today's construction professionals. Products are sold through an authorized distribution network. The family-owned and operated company focuses on product quality, business integrity, and outstanding service since its founding in 1926.
About Us | Vapor Barriers | Air Barriers | Concrete Expansion Joints | All Construction Products

Speak Your Mind

*