|
|
Project: Rona Home Centre Rona was very happy with the floor. This installation utilizes the Extended Life floor maintenance system. |
|
![]() |
![]() |
![]() |
![]() |
Project: University of Alberta Chemical and Materials Engineering Building Before and after pictures shown. The application involved removing existing floor tiles and then grinding off the adhesive down to the concrete. The floor was then polished, using up to the 1500-grit pad. |
|||
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |