PERMINATOR @ GRADE BEAM EXTENDED UNDER SLAB
PERMINATOR @ THICKENED SLAB
PERMINATOR BASE OF ELEVATOR PIT (FLUSH WALL TO SLAB) (MEL-ROL TRANSITION)
PERMINATOR BASE OF ELEVATOR PIT (MEL-ROL TRANSITION)
PERMINATOR BASE OF WALL TRANSITION TO MEL-ROL (FLUSH WALL TO SLAB)
PERMINATOR COLUMN BASE- N.S.S ABOVE COLUMN BASE (ABOVE WATER TABLE)
PERMINATOR COLUMN BASE- N.S.S ON COLUMN BASE (ABOVE WATER TABLE)
PERMINATOR COLUMN BASE- S.S ON GRADE (ABOVE WATER TABLE)
PERMINATOR HORIZONTAL PIPE PENETRATION
PERMINATOR MEMBRANE PENETRATION CLUSTER (LESS THAN 1 INCH SEPERATION) (MUD SLAB)
PERMINATOR N.S.S @ GRADE BEAM SLAB EDGE (ABOVE WATER TABLE)
PERMINATOR PILE CAP- S.S ON GRADE (ABOVE WATER TABLE) 2
PERMINATOR PILE CAP- S.S ON GRADE (ABOVE WATER TABLE)
PERMINATOR PILE CAP- S.S ON GRADE @ SLAB EDGE (ABOVE WATER TABLE)
PERMINATOR TRANSITION TO PRECON @ BLINDSIDE WALL BASE
PERMINATOR UNDERSLAB TERMINATION @ BASE OF FOUNDATION WALL COND.2
