This installation featured our new AIR-SHIELD ALUMINUM SHEET MEMBRANE product.
Building Envelope Case Studies
Explore our case studies that outline solutions for airport rail station waterproofing, stadium waterproofing, tunnel floor waterproofing, and more.
A New Home For Bioscience Research (Case Study)
Learn how the University of Arizona chose W. R. MEADOWS to properly waterproof their new bioresearch laboratory.
Eastern Michigan University Quirk Hall (Case Study)
Keeping school facilities dry for students: W. R. MEADOWS helps repair Eastern Michigan University’s Quirk Hall.
Minneapolis Veterans Home Building (Case Study)
The Final Phase of a Long-Term Project to Serve Veterans. Updating and modernizing this important facility, which is depended upon…
Working to Preserve America’s Waterways (Case Study)
Challenge: During heavy rain and snow storms, the existing waste water systems in Toledo are often overtaxed. The result is…
Destination – D/FW and the world (Case Study)
PRECON is the choice for waterproofing on Dallas/Fort Worth International Airport rail station project. The PRECON system with BEM helped…
Vanier Football Complex (Case Study)
Kansas State calls waterproofing audible for football complex construction. Total team effort results in the right W. R. MEADOWS solutions.…
A Waterproofing First in the South (Case Study)
Contrary to popular belief, Seattle is not the soggiest city in the United States, it’s Mobile, Alabama with 67 inches…
Waterproofing an Indoor Waterpark (Case Study)
Winter waterproofing of Waterpark in the Poconos Mountains required switch to W. R. MEADOWS MEL-ROL The opposite of desert conditions…
The Michael Kors Building (Case Study)
A shining icon of caring rises on the streets of New York W. R. MEADOWS plays role in New Michael…
Canada’s Dry (Case Study)
Ontario Hospital additions avoid water issues with W. R. MEADOWS waterproofing products Hawkesbury & District General Hospital Redevelopment Project When…
Underground Waterproofing: PRECON makes a splash on huge Arizona project (Case Study)
Installers can put down 50,000 sq. ft. of PRECON in a day, according to contractors at Marina Heights. Firestop Southwest’s…