PERMINATOR (20MIL) @ THICKENED SLAB
PERMINATOR (20MIL) BASE OF ELEVATOR PIT (FLUSH WALL TO SLAB) (MEL-ROL TRANSITION)
PERMINATOR (20MIL) BASE OF ELEVATOR PIT (MEL-ROL TRANSITION)
PERMINATOR (20MIL) BASE OF WALL TRANSITION TO MEL-ROL (FLUSH WALL TO SLAB)
PERMINATOR (20MIL) BASE OF WALL TRANSITION TO MEL-ROL LM (FLUSH WALL TO SLAB)
PERMINATOR (20MIL) COLUMN BASE- N.S.S ABOVE COLUMN BASE (ABOVE WATER TABLE)
PERMINATOR (20MIL) COLUMN BASE- N.S.S ON COLUMN BASE (ABOVE WATER TABLE)
PERMINATOR (20MIL) COLUMN BASE- S.S ON GRADE (ABOVE WATER TABLE)
PERMINATOR (20MIL) END OF SHEET OVERLAP
PERMINATOR (20MIL) HORIZONTAL PIPE PENETRATION
PERMINATOR (20MIL) MEMBRANE PENETRATION CLUSTER (LESS THAN 1 INCH SEPERATION) (COMPACTED AGGREGATE)
PERMINATOR (20MIL) MEMBRANE PENETRATION CLUSTER (LESS THAN 1 INCH SEPERATION) (MEL-ROL LM) (COMPACTED AGGREGATE)
PERMINATOR (20MIL) MEMBRANE PENETRATION CLUSTER (LESS THAN 1 INCH SEPERATION) (MUD SLAB)
PERMINATOR (20MIL) N.S.S @ GRADE BEAM SLAB EDGE (ABOVE WATER TABLE)
PERMINATOR (20MIL) PILE CAP- S.S ON GRADE (ABOVE WATER TABLE) 2
PERMINATOR (20MIL) PILE CAP- S.S ON GRADE (ABOVE WATER TABLE)
PERMINATOR (20MIL) PILE CAP- S.S ON GRADE @ SLAB EDGE (ABOVE WATER TABLE)
PERMINATOR (20MIL) TERMINATION @ FACE OF FOOTING
PERMINATOR (20MIL) TRANSITION TO MEL-ROL LM @ BASE OF WALL
PERMINATOR (20MIL) TRANSITION TO PRECON @ BLINDSIDE WALL BASE
PERMINATOR (20MIL) TRANSITION TO PRECON @ UNDERSLAB
PERMINATOR (20MIL) UNDERSLAB TERMINATION @ BASE OF FOUNDATION WALL COND.2
PERMINATOR (20MIL) UNDERSLAB TERMINATION @ BASE OF FOUNDATION WALL
PERMINATOR (20MIL) UNDERSLAB TERMINATION
