PRECON SOIL NAIL Installation Instructions
1. Ensure soil nail is clean and clear of any contaminants that could be detrimental to the bond of the HYDRALASTIC 836. |
2. Apply BEM around all edges of the soil nail plate and all areas around the nut. |
3. Apply HYDRALASTIC 836 over complete soil nail and plate, totally covering the area of the soil nail. |
4. Cut a piece of DETAIL FABRIC to the dimensions of the soil nail plate and embed the fabric into the previously applied HYDRALASTIC 836. |
5. Cut another two pieces of DETAIL FABRIC, one for the shaft of the soil nail, the other for the top, and embed this fabric into the previously applied HYDRALASTIC 836. |
6. Ensure the soil nail is totally encapsulated in the HYDRALASTIC 836 and DETAIL FABRIC prior to application of PRECON blindside membrane. |
*Installation guidelines does not show installation of MEL-DRAIN™ or PRECON for ease of viewing each step. Refer to W. R. MEADOWS installation instructions or Technical Services for complete instructions.