When Kalahari Resorts & Conventions in Pennsylvania’s Pocono Mountains was in urgent need of a tough waterproof material that could hold up to a harsh winter construction environment after a previously chosen product wasn’t able to meet the temperature requirements needed to not delay the renovation deadline, John Rakus, Estimator for EDA, reached out to Tim Durso with W. R. MEADOWS. Tim was able to immediately recommend MEL-ROL waterproofing membrane for the project. Jason Sorci, Partner/CFO of Architectural Design Consultants, Inc., had no problem approving the product switch to MEL-ROL after hearing about its flexibility, versatility, and dependable nature. During…
Blog
Case Study
Read our new Airbus case study!
The first-ever Airbus manufacturing facility in the U.S. was waterproofed using products from W. R. Meadows. We’re proud of this fact and our newest case study relays the facts in this unique application. One of the biggest hurdles to overcome was the fact that the site of this project, Mobile, Alabama, is the rainiest city in the U.S. Obviously, high quality waterproofing materials were needed to ensure that moisture did not intrude the structure and the architect and contractor team decided upon our Precon, Perminator, and Mel-Drain products. As the September 2015 grand opening of the Airbus plant – which…