W. R. Meadows® has stretched its footprint across the world and had its hand in countless high-profile projects in its 90 years. Recently, however, we were happy to be involved in waterproofing the largest office development in the history of the state of Arizona: Marina Heights. Details of the project, and of how our Precon® – among other W. R. Meadows products – played such a critical role, are outlined in a case study called “Underground Waterproofing: W. R. Meadows Precon® makes a splash on huge Arizona project.”
This case study takes a deep dive into explaining the parameters, challenges, and solutions to this massive underground waterproofing project, which Precon was called on to help solve. It features interviews from some of the project’s key players, large project photos, and a list of all Meadows products used (and how much).
Be sure to give the case study a read, and let us know your thoughts below!