The project is a new, two-story, 22,800 SF building addition to the high school campus.
Institutional Construction Projects
Rocky Heights Elementary School
This project utilized both our exterior building envelope and interior polished concrete systems.
Portland Community College
Portland Community College’s Oregon Manufacturing Innovation Center (OMIC) Training Center, in Scappoose, is a world-class facility for…
Western Washington University Building
MEL-ROL was used to properly waterproof this educational facility.
OSF Cancer Center
This healthcare project utilized 55,000 sf of our air-barrier material.
Mayo Hospital
PRECON was used to waterproof foundation walls as well as the hospital’s tunnel system.
Eastgate Elementary School
Our AIR-SHIELD and MEL-ROL products were used to seal the building envelope in this new school.
Centra Care St. Cloud Hospital Helipad
This unique hospital helipad project featured our MEL-ROL concrete waterproofing system.
North Branford High School
AIR-SHIELD LSR liquid synthetic rubber air barrier was installed on this project.
Joya Child and Family Development
MEL-ROL and MEL-DRAIN were used to waterproof and drain ground water away for this new construction.
Ridgeline High School
MEL-ROL was used to waterproof the concrete foundation walls of this large school in Spokane, WA.
Southeast Technical Career Academy
This project featured our sheet-applied, vapor-permeable air barrier.
Wexford Phoenix Biomedical Campus
This project earned LEED Silver certification.
Grandview High School
This project featured our liquid-applied vapor permeable air barrier and compatible flashing.
Jefferson High School
MEADOW-CRETE FNP was installed around precast rough openings.
Ball State Foundational Science Building
AIR-SHIELD was used as the air barrier for this project at Ball State University.
Banner Hospital
This project utilized the high-build system consisting of a 120-mil layer of HYDRALASTIC 836 SL embedded with REINFORCING FABRIC HCR.
Jefferson Middle School
This project featured our high puncture resistance vapor barrier, PERMINATOR HP.
HUB 4 Tucson Off-Campus Student Housing
This project featured our white PRECON material.
Valleywise Health Hospital Expansion
LEED-Certified Gold project.
Harrison Junior High School
This project featured PMPC, the best combination of vaporproofing and waterproofing currently available.
Northwest Kidney Centers – Rainier Beach
This project featured our puncture-resistant vapor barrier.
Johnson Middle School
This project features both our underslab vapor barrier and concrete waterproofing products.
Building A Standout Education Facility (Case Study)
This installation featured our new AIR-SHIELD ALUMINUM SHEET MEMBRANE product.
Boise VA Hospital Parking Garage
MEL-ROL was used to waterproof this parking garage across the street from the VA hospital.
Bothell High School
The project featured our high puncture resistance vapor barrier.
University of Oklahoma Headington Hall
This project features our liquid-applied, vapor-permeable air barrier.
A New Home For Bioscience Research (Case Study)
Learn how the University of Arizona chose W. R. MEADOWS to properly waterproof their new bioresearch laboratory.
Arizona State University Biodesign Institute Building B
This project is the first project to earn LEED Platinum certification in Arizona. HYDRALASTIC 836 was used for vertical substrates…
W.T. Sampson School, US Naval Station
This project featured our liquid- and sheet-applied air barrier systems.
Walkerton High School
This project featured our sheet-applied air barrier along with our vaporproofing technology.
Eastern Michigan University Quirk Hall (Case Study)
Keeping school facilities dry for students: W. R. MEADOWS helps repair Eastern Michigan University’s Quirk Hall.
Bryant Middle School
This project featured our vapor permeable thin-mil air barrier.
McCausland Lower School & Commons at Springside Chestnut Hill Academy
This project featured our new AIR-SHIELD ALUMINUM SHEET MEMBRANE product.
Oklahoma State University Teaching Lab
This project featured our thin-mil and liquid flashing air barrier technology.
St. Francis Cancer Center
Project featured our fluid-applied permeable air barrier.
University of Arizona Bioresearch Laboratory
Project earned LEED Gold certification.
Eastern Michigan University Quirk Hall
This project featured our new CLAY-TITE bentonite waterproofing membrane.
Wayne State University Mike Ilitch School of Business
This large educational project featured our permeable air barrier.
University of Pennsylvania New College Hall
A complete waterproofing and vaporproofing solution was provided for the University of Pennsylvania.