This large international project featured our PERMINATOR vapor barrier product.
Commercial Construction Projects
Genentech Distribution Center
Our high-puncture resistance vapor barrier was used in this large distribution center.
FCA Hoover
PERMINATOR EVOH gas barrier was installed in this large warehouse project.
M+ Museum
This project features our popular concrete waterproofing products, PRECON and MEL-ROL.
Atlantis, The Palm
Project: Atlantis, The Palm Location: The Palm Jumeirah – Dubai – United Arab Emirates Contractors: Laing O’Rourke and Western Waterproofing…
CubeSmart Self Storage
Our deck waterproofing system was installed in this storage facility in Brooklyn.
Life Time, Inc. Corporate Headquarters
This project featured our new sheet-applied vapor-permeable air barrier, AIR-SHIELD SMP.
Costco
This retail concrete floor features our concrete densifier, curing aid, and penetrating sealer.
Coolalinga Central
Our standard LIQUI-HARD was used in this INDUROSHINE polished concrete application in Australia.
Heffner Toyota
MEL-ROL was used to waterproof the concrete planters and foundation of this Toyota dealership.
The Westin Tempe
This new hotel featured a total waterproofing system from W. R. MEADOWS.
Msheireb Downtown Phase 4
This project featured over one million square feet of our fluid-applied air barrier.
Alteriors Contemporary Furniture
The high-sheen concrete floor was created by our INDUROSHINE system.
Motorcycle Showroom
This floor utilized the entire INDUROSHINE floor polishing process.
High-End Retail Clothing Store
This is a retrofit for a high-end retail clothing store in the South Edmonton Common shopping mall.
Westlind Group Sales
Floor was burnished after application of LIQUI-HARD ULTRA and BELLATRIX.
Citrus Tower Parking Garage
This parking structure featured both waterproofing and vaporproofing materials from W. R. MEADOWS.
River Landing Development Phase 1
Over 100,000 square feet of PRECON pre-applied membrane and accessories were installed.
Pinnacle Ridge Private Residence
DECRA-SEAL was used to seal approximately 10,000 square feet of pavers in a single-coat application.
Saginaw 2 Apartments
HYDRALASTIC 836 and accessories were used to waterproof this large apartment complex.
Goodwill Retail Outlet
Concrete surface was densified with LIQUI-HARD and protected with BELLATRIX.
Pine Medical Center
Our liquid synthetic rubber air barrier was installed on this medical facility.
VA Hospital Building 31
Over 15,000 square feet of our PERMINATOR HP vapor barrier and accessories was used on the VA Hospital Building project.
Mercy Clinic
AIR-SHIELD TMP was installed along with our liquid- and sheet-applied flashing systems.
Old National Bank
This project featured our thin-mil air barrier with a suite of accessory products.
DoubleTree Hotel
This project featured our AIR-SHIELD TMP/AIR-SHIELD LIQUID FLASHING system.
A Storage Place of Wilsonville
Nearly 80,000 square feet of concrete was vaporproofed and densified in this application.
Lacombe Lift Station
This project utilized three popular building envelope membranes, PRECON, MEL-ROL, and HYDRALASTIC 836.
Serious Coffee
Floor was topically dyed and polished.
Hoover Recreational Complex
Over 30,000 square feet of our thin-mil air barrier and accessories was used on this new rec center in Hoover,…
Country Club Plaza Parking Garage
The substrate was cleaned and free of the existing membrane. The corners and vertical edges were then leveled off with…
VA Portland Health Care System
The 26,000 square foot Fairview clinic is replacing the east CBOC with nearly four times the space. The new facility…
Bean Dock
Project featured nearly 30,000 feet of waterproofing protection for a waterside dock where special events, such as weddings, are held.
Quintet Phase 2
Over 100,000 square feet of waterproofing and accessories were used in this project in British Columbia.
Verve Apartments
Cleaned-up the look of the concrete walls that line the entry/exit of the parking garage, which lies below a large…
The Legion
Project Name: The Legion Location: Calgary, Alberta, Canada Architect: S2 Architecture Contractor: Durwest Construction Systems Products: HYDRALASTIC 836 PRECON Scope:…
Macerich Scottsdale Fashion Square
20,000 square feet of 120-mil HYDRALASTIC 836 high-build system with REINFORCING FABRIC HCR installed on plaza deck over subterranean parking…
Kolde Construction Warehouse Approach
Patched 4′ x 200′ long entry approach underneath Kolde Construction warehouse doors. Repair area was cut out to about 1/2″…
ASU Center for Law and Society
50,000 square feet LEED-Certified Gold waterproofing project in Phoenix, Arizona.
Destination – D/FW and the world (Case Study)
PRECON is the choice for waterproofing on Dallas/Fort Worth International Airport rail station project. The PRECON system with BEM helped…