Project: MacDill Air Force Base Location: Tampa, Florida, USA Architect: Army Corps of Engineers Contractor: Water-Tite Solutions Scope: 125,000 square feet Salesperson: Tim Price AIR-SHIELD was used on all of the joints: CMU to DensGlass, concrete to DensGlass, and CMU to steel. Then, AIR-SHIELD LM was applied over that and the entire building. Then insulation and a metal facade was placed. |