The Red Rocks Amphitheater ADA Improvements, Phase 2 Download Case Study (.pdf) Nestled in the rugged foothills of the Rocky…
REINFORCING FABRIC HCR Projects
Red Rocks Amphitheater
As part of ongoing improvements, the Red Rocks Amphitheater embarked on the second phase of its ADA compliance upgrades, utilizing…
190 Carondelet Amenity Suite
This is a multi-use building. It houses law firms, various businesses, etc.
South Park Pump Station
This water treatment station was waterproofed using our MEL-ROL and PRECON products.
Terra Residences at Maple Grove Health Village
This project featured our HRM 714 hot-applied waterproofing system.
York Street Pump Station
Our full line of building envelope materials was used to seal the structure tightly.
Banner Hospital
This project utilized the high-build system consisting of a 120-mil layer of HYDRALASTIC 836 SL embedded with REINFORCING FABRIC HCR.
University of Notre Dame
PRECON FABRIC TAPE was used to tie in HYDRALASTIC 836 to MEL-ROL over the outside perimeter.
Ottawa River Storage Tank
This massive underground tank was waterproofed using our HYDRALASTIC 836 fluid-applied membrane and accessories.
Quintet Phase 2
Over 100,000 square feet of waterproofing and accessories were used in this project in British Columbia.
Macerich Scottsdale Fashion Square
20,000 square feet of 120-mil HYDRALASTIC 836 high-build system with REINFORCING FABRIC HCR installed on plaza deck over subterranean parking…
ASU Center for Law and Society
50,000 square feet LEED-Certified Gold waterproofing project in Phoenix, Arizona.
Hayden Ferry Lakeside Phase III
Project Name: Hayden Ferry Lakeside Phase III Location: Tempe, Arizona, USA Architect: The Davis Experience Contractor: Ryan Companies Subcontractor: Firestop…