The larger format ceramic floor tile specified on this project required tighter tolerances for subfloor flatness. The FLOOR-TOP STG installation…
Construction Projects
Catasauqua Municipal Building
This project featured a complete W. R. MEADOWS building envelope system.
East Carolina University Family Medicine Center
Both our sheet-applied air barrier and waterproofing products were used in this medical facility.
Pine Medical Center
Our liquid synthetic rubber air barrier was installed on this medical facility.
Durham County Human Services Building
This large project utilized our original fluid-applied AIR-SHIELD LM technology.
Minnesota Veterans Home Building 22
Contractor installed 73,000 square feet of AIR-SHIELD LMP behind both metal panel and brick finishes.
VA Hospital Building 31
Over 15,000 square feet of our PERMINATOR HP vapor barrier and accessories was used on the VA Hospital Building project.
Mercy Clinic
AIR-SHIELD TMP was installed along with our liquid- and sheet-applied flashing systems.
High Hollow Road Bridge
MEL-DEK deck waterproofing system was used to waterproof this bridge in New York.
Old National Bank
This project featured our thin-mil air barrier with a suite of accessory products.
Windermere High School
Project is a 340,000-square-foot, multi-story prototype high school that sits on a 68-acre greenfeld site in West Orange County, Florida.
Working to Preserve America’s Waterways (Case Study)
Challenge: During heavy rain and snow storms, the existing waste water systems in Toledo are often overtaxed. The result is…
DoubleTree Hotel
This project featured our AIR-SHIELD TMP/AIR-SHIELD LIQUID FLASHING system.
University of Notre Dame
PRECON FABRIC TAPE was used to tie in HYDRALASTIC 836 to MEL-ROL over the outside perimeter.
Broken Arrow High School
A full W. R. MEADOWS air barrier and flashing system was utilized in this project.
A Storage Place of Wilsonville
Nearly 80,000 square feet of concrete was vaporproofed and densified in this application.
Lacombe Lift Station
This project utilized three popular building envelope membranes, PRECON, MEL-ROL, and HYDRALASTIC 836.
Serious Coffee
Floor was topically dyed and polished.
Reser Stadium at Oregon State University
Over 25,000 square feet of our PERMINATOR vapor barrier and accessories was used on the Reser Stadium project at Oregon…
Lewis-McChord Joint Military Base Swimming Pool
The US Army Corps of Engineers selected DECK-O-SEAL to reseal the joints in a swimming pool on the Lewis-McChord Joint…
Hoover Recreational Complex
Over 30,000 square feet of our thin-mil air barrier and accessories was used on this new rec center in Hoover,…
Drinking Water Treatment Plant
The concrete clarifiers in this waste water treatment facility were successfully waterproofed and protected with CEM-KOTE FLEX ST.
University of Missouri South Housing
Project featured 80,000 square feet of our thin-film air barrier and accessories.
Country Club Plaza Parking Garage
The substrate was cleaned and free of the existing membrane. The corners and vertical edges were then leveled off with…
Private Residence/Winery
This residence required durable waterproofing to protect the basement winery from moisture intrusion and HYDRLASTIC 836 was selected to…
Ottawa River Storage Tank
This massive underground tank was waterproofed using our HYDRALASTIC 836 fluid-applied membrane and accessories.
VA Portland Health Care System
The 26,000 square foot Fairview clinic is replacing the east CBOC with nearly four times the space. The new facility…
Onyx Cooling Tower Basin
Project featured nearly 45,000 square feet of cementitious waterproofing protection and concrete restoration.
Curtis High School
An inferior joint sealant was removed from this large swim center pool and replaced with DECK-O-SEAL GUN GRADE.
Bean Dock
Project featured nearly 30,000 feet of waterproofing protection for a waterside dock where special events, such as weddings, are held.
Quintet Phase 2
Over 100,000 square feet of waterproofing and accessories were used in this project in British Columbia.
Verve Apartments
Cleaned-up the look of the concrete walls that line the entry/exit of the parking garage, which lies below a large…
Pearson Elementary
Vapor permeable AIR-SHIELD LMP was used on this project along with AIR-SHIELD LIQUID FLASHING as the flashing membrane for the…
Crum Creek Viaduct
BEM was used to smooth out areas that were out of plane. It helped the contractor as the product helped…
Doon South Sanitary Pumping Station
Tank was built using concrete caissons. Discussion ensued over the best way to waterproof the tank. Engineer didn’t want to…
The Legion
Project Name: The Legion Location: Calgary, Alberta, Canada Architect: S2 Architecture Contractor: Durwest Construction Systems Products: HYDRALASTIC 836 PRECON Scope:…
Macerich Scottsdale Fashion Square
20,000 square feet of 120-mil HYDRALASTIC 836 high-build system with REINFORCING FABRIC HCR installed on plaza deck over subterranean parking…
Kolde Construction Warehouse Approach
Patched 4′ x 200′ long entry approach underneath Kolde Construction warehouse doors. Repair area was cut out to about 1/2″…
ASU Center for Law and Society
50,000 square feet LEED-Certified Gold waterproofing project in Phoenix, Arizona.
Destination – D/FW and the world (Case Study)
PRECON is the choice for waterproofing on Dallas/Fort Worth International Airport rail station project. The PRECON system with BEM helped…